如何測量驗收環氧防靜電地坪?防靜電地坪驗收測量前,應用潔凈的紗布將環氧樹脂地坪表面擦干凈,嚴重玷污的應用中性液清洗干凈。然后將室內空調打開,保持一定溫度連續開上23天,規定的溫濕度條件下測量。放置電極前先用軟布條插去地表面所有塵物,電極表面在放置前要用干凈的軟布條粘上異丙醇不少于70水插試干凈,22面積,至少做5次測試.5次測試中少3次的測試應當包括受磨損的有化學品或水濺落的有明顯沾污的區域。
How to measure and accept the epoxy anti-static floor? Before acceptance of the anti-static floor, clean the surface of the epoxy resin floor with clean gauze, and clean the application neutral liquid which is seriously polluted. Then turn on the indoor air conditioning, keep a certain temperature for 23 days, and measure under the specified temperature and humidity conditions. Before placing the electrode, insert all dust on the surface with a soft cloth strip. Before placing the electrode surface, stick isopropanol with a clean soft cloth strip at least 70 water plugs to test clean, 22 areas, and at least 5 tests. Less than 3 tests in 5 tests should include worn areas with obvious contamination caused by chemicals or splashed water.
環氧防靜電地坪優勢:
Epoxy anti-static floor advantages:
對于環氧防靜電環氧地坪來說,首先要考慮到環氧地坪涂層的防靜電指標;
For the epoxy anti-static floor, the anti-static index of the epoxy floor coating should be considered first.
其次還有環氧地坪涂層的抗壓強度、抗拉強度和耐磨性,以及通常的耐化學品性能。
Secondly, there are the compressive strength, tensile strength and wear resistance of epoxy floor coating, as well as the usual chemical resistance.
所以在設計防靜電環氧地坪漆配方時基本上選用環氧樹脂作為基料,添加導電物質、填料、溶劑及助劑,制成環氧防靜電地坪漆涂料。
Therefore, epoxy resin is basically selected as binder, conductive materials, fillers, solvents and additives are added to make epoxy antistatic floor paint.
(1)、環氧防靜電地坪擁有環氧樹脂地坪的一切優異性能,可快速排泄靜電電荷、防靜電效力持久;
(1) The epoxy anti-static floor has all the excellent properties of the epoxy resin floor, which can quickly excrete electrostatic charges and have a lasting anti-static effect.
表面電阻率達到106Ω-109Ω、地面電阻排泄符合國際GB6650-86A標準。
The surface resistivity reaches 106_-109_, and the surface resistance excretion meets the international GB6650-86A standard.
(2)、環氧防靜電地坪整體無縫,能達到:防塵、堅韌耐磨、耐沖擊、耐重壓、
(2) The epoxy anti-static floor is seamless as a whole, which can achieve: dust-proof, tough and wear-resistant, impact-resistant, weight-resistant and pressure-resistant.
耐腐蝕、耐溶劑、平整亮麗、便于清理、維護,保養,且使用壽命長之目的。
Corrosion resistance, solvent resistance, smooth and bright, easy cleaning, maintenance, and long service life.
(3)、環氧防靜電地坪可防止、清理靜電、電磁波產生 、干擾破壞,抗靜電效力持久。
(3) Epoxy anti-static floor can prevent and clean up static electricity, electromagnetic wave generation, interference and destruction, and the anti-static effect is lasting.
環氧地坪漆展示圖
Epoxy Floor Paint Display
防靜電地坪漆的施工方法:
Construction method of anti-static floor paint:
1. 基材整理:用研磨工具將素地之雜質研磨清除,并將混凝土表面粗糙化后,用工業吸塵器將灰塵完全清潔干凈.
1. Material finishing: The ground impurities are removed by grinding tools, and the concrete surface is roughened. The dust is cleaned completely by industrial vacuum cleaner.
表面須平整,堅固且經充分干燥.
The surface should be smooth, firm and fully dried.
表面之油脂、泥土等須充分清除,素地不超過(含水率8%、濕度80%、溫度高35°c低15°c)即可施作.
The grease and soil on the surface should be removed sufficiently, and the vegetable land can be applied without exceeding 8% moisture content, 80% humidity and 35_c high temperature and 15_c low temperature.
2. 底涂施做:將環氧底涂甲乙組分材料均勻攪拌,用滾筒十字法涂布在素地之上,約十個小時后,就可中涂施工。
2. Primer coating: Equilibrium mixing of epoxy primer A and B component materials, and coating on plain ground with roller cross method. After about ten hours, middle coating can be carried out.
3. 鏝涂中涂層: 將環氧防靜電自流平中涂材甲乙組分加80%的 石英粉均勻鏝涂在底涂之上。
3. Intermediate coating in dysprosium coating: Apply 80% quartz powder to the base coating evenly by adding component A and B of epoxy anti-static self-leveling coating material.
4. 中涂研磨及整理:中涂硬化24小時后,檢查中涂層表面,若發現中涂層有部分區域顯露砂石粗糙面;
4. Grinding and finishing: After 24 hours hardening, inspect the surface of the middle coating, if it is found that some areas of the middle coating expose rough surface of sand and stone;
必須以環氧樹脂批土進行修補批覆工作,否則影響面涂鋪設之成敗;
Epoxy resin batch soil must be used for repair and repair, otherwise the success or failure of surface coating will be affected.
待中涂硬化后,用研磨機械將表面石磨粗糙及清除雜質,并用工業用吸塵器將場地清潔干凈.
After hardening, the surface is roughened and impurities are removed by grinding machine, and the site is cleaned by industrial vacuum cleaner.
5. 銅鉑鋪設:將銅箔按10M*10M見方貼,貼實地面并作接地
5. Copper and Platinum Laying: Copper foil is square pasted according to 10M*10M, adhered to the ground and grounded.
6. 導電底涂鋪設:將導電底涂甲乙組分依比例均勻混合后, 用滾 筒均勻鋪設于環氧砂漿層之上,二道間隔24小時。
6. Conductive primer laying: After uniformly mixing the A and B components in proportion, the conductive primer is evenly laid on the epoxy mortar layer with a drum, with a 24-hour interval between the two channels.
7. 面涂鋪設:將防靜電自流平面涂甲乙組分依比例均勻混合后, 用鋸齒鏝刀均勻鋪設于導電底涂之上;
7. Surface coating: After uniformly mixing the components of A and B in proportion, the anti-static self-flow plane is evenly laid on the conductive primer with a saw-tooth trowel.
完成待48小時后,人員方可進入,七天后,重機械方可進入.
After 48 hours of completion, personnel can enter, and after seven days, heavy machinery can enter.